• Area Size500m2
  • Construction Time26 Weeks
  • SystemRecirculation

Kingcombe Stonbury were commissioned to design and construct a new natural themed Splash Park, that included an amphitheatre and skate park for additional use outside the water play season. A detailed design was required to blend the splashpad into the existing landscape and was influenced by the local roman heritage.

‘‘’Greatly updated with children’s splash park area- skateboard park area for older kids and a huge expanse of well kept gardens and grass area for people to enjoy the tranquillity and outdoors.’’

‘‘’Grandchildren particularly enjoyed the large wooden climbing frame etc and the splash park which on this hot day was very popular’’

Main Features:

  • Concrete Surface
  • Integrated LED Lights
  • 63 No. Inground Ecosplash Jets
  • Amphitheatre Seating